1 |
Excavation of Athagarh Branch Canal from RD 2.22 Km to 9.12 Km including Construrction of
the strurctures, service Road and lining except MDR Bridge at RD 4.212 Km of
Right Bank Canal of RIP |
The Senior Manager(Civil) OCC Ltd.Dhenkanal
Group of Projects, DKL. |
₹
3,929.61 |
Ongoing |
2 |
Execution of Mega PWS project to Badapada and Papermetla GPs including five years
maintenance cost under Chitrakonda Block in Malkangiri District |
The Executive Engineer, RWSS Division, Malkangiri |
₹
1,725.30 |
Ongoing |
3 |
Improvement to Badamuniguda to Kusulipeta from 0/0 to 7/306 Km road and construction of
HL Bridge over Jhanjabati at 3/390 Km on Bhitaramundiguda to Kusulipada to Road
in the dist. Of Koraput under RCPLWE Phase-II Scheme, Package No. OR19RCPL-17. |
The Executive Engineer, Koraput (R & B) Division, Koraput. |
₹
1,452.75 |
Ongoing |
4 |
“EXECUTION OF RURAL PIPED WATER SUPPLY TO Vill- 1. Turchi & Saidalanga 2.M.Rampur 3.
Deulsulia, 4.Dumerguda 5.Alatara and its Adj. Villages under M.Rampur Block
incluing 05 year of O&M of Kalahandi district under RWS&S Division Bhawanipatna
on Turnkey basis |
The Executive Engineer, RWSS Division, Kalahandi |
₹
620.47 |
Ongoing |
5 |
Construction of Multipurpose Cyclone Shelter at A- Parala under Krushnaprasad Block,
B-Biripadar under Krushnaprasad Block, C-Govindpur under Brahmagiri Block, D-
Malasahi Melana padia under Puri Sadar Block in the dist. of Puri for the year
2020-21. |
The Executive Engineer, Rural Works Division, Puri, Odisha. |
₹
633.79 |
Ongoing |
6 |
Construction of H.L Bridge over Pejwara Nallah at 9/100 km on NalabaharSarthamuhan road
in the District of Balasore |
The Superintending Engineer, Rural Works Circle, Balasore |
₹
1,063.95 |
Ongoing |
7 |
Execution of PWS to village Bilipada & its adjoining villages under Pipili Block
including 5 years O&M of Puri District, Odisha |
The Engineer-in-Chief, RWS & S, Odisha, Bhubaneswar. |
₹
585.49 |
Ongoing |
8 |
Execution of Rural Piped Water Supply Project pertaining to 58 villages of Andrapalli,
Jantri, Jodambo & Panasaput GPs under Chitrakonda Block of Malkangiri District
including 5 years O&M on TURNKEY contract under the package |
The Engineer-in-Chief, RWSS,(Water Supply) Odisha, Bhubaneswar |
₹
3,657.99 |
Ongoing |
9 |
Execution of Rural Piped Water Supply Project pertaining to 04 Nos of GP (101 Nos of
villages) under Muniguda Block of Rayagada District including 5 years O&M on
TURNKEY contract under the package |
The Engineer-in-Chief, RWSS,(Water Supply) Odisha, Bhubaneswar |
₹
4,902.96 |
Ongoing |
10 |
Execution of Rural Piped Water Supply Project pertaining to 06 Nos of GP (48 Nos of
villages) under Muniguda Block of Rayagada District including 5 years O&M on
TURNKEY contract under the package |
The Engineer-in-Chief, RWSS,(Water Supply) Odisha, Bhubaneswar |
₹
4,848.06 |
Ongoing |
11 |
Improvement to Aradei MIP (Res) in Sadar Block of Keonjhar District under DRIP Phase II |
The Superintending Engineer, Eastern Minor Irrigation Circle, Keonjhar, Odisha. |
₹
454.76 |
Ongoing |
12 |
Renovation to Head Works of Jagadala MIP (RES) in Sadar Block under Phase – II |
The Superintending Engineer, Eastern Minor Irrigation Circle, Keonjhar, Odisha. |
₹
492.09 |
Ongoing |
13 |
CONSTRUCTION OF UNDER GROUND PIPE LINE IRRIGATION SYSTEM (GRAVITY FLOW) IN
BISAMGIRI MIP, JARIGUMA MIP IN KALAHANDI DISTRICT, KARANGABHATA MIP IN NUAPADA
DISTRICT, GHATAGUDA MIP IN KORAPUT DISTRICT,CHITUGHAT MIP IN NABARANGAPUR
DISTRICT AND PUJARIGUDA MIP, GOIGUDA MIP & KARANJA MIP IN RAYAGADA DISTRICT
INCLUDING DISTRIBUTION SYSTEM AND COMMAND AREA DEVELOPMENT FOR 2058 HA OF CCA
(UNDER PACKAGE-III) |
The Managing Director, OCCLtd., Bhubaneswar |
₹
5,339.33 |
Ongoing |
14 |
Construction of In-stream Storage Structure at Village Sirigida Across River Banguru in
District Angul. |
The Chief Engineer & Basin Manager, Brahmani Basin, Samal |
₹
1,358.86 |
Ongoing |
15 |
Execution of Rural Piped Water Supply Project pertaining to Badpadar and Chitrakonda GP
in ChitraKonda Block( 21 Villages) in Malkangiri District including 5 years O&M. |
The Engineer-in-Chief, RWSS,(Water Supply) Odisha, Bhubaneswar |
₹
2,501.56 |
Ongoing |
16 |
CONSTRUCTION OF UNDER GROUND PIPE LINE IRRIGATION SYSTEM (GRAVITY FLOW) IN BHATAPUR MIP BAIRAGIHALWA MIP AND RELIKUPANALA MIP
IN AYAGADA DISTRICT INCLUDING
DISTRIBUTION SYSTEM AND COMMAND AREA DEVELOPMENT (UNDER PACKAGE-III- 3rd phase) |
The Senior Manager (civil), OCCLtd., UGPL, projects , Rayagada |
₹
4,343.42 |
Ongoing |