DETAILS OF WORK ORDER
UNDER PRIVATE / PUBLIC SECTOR ORGANISATION
Completed Work
Orders:
1.
Simplex Infrastructures Limited.
2.
Essar Projects (India) Limited.
3.
Nagarjuna Construction Company limited (NCC Ltd)
4.
Lanco Infratech Limited
5.
IVRCL Limited
6.
ITD Cementation India Limited.
7.
POSCO-India
8.
Indian Oil Corporation Limited (IOCL)
9.
Vodafone Space Tel Limited.
10.
Reliance Corporate IT
Park Ltd.
Great Achievements:
a)
We had been Awarded Three works of Storm Water Drainage System of the Nabakalebar
Urgency Work – 2015 funded by the “Housing & Urban Development”, the most
complexity portion and successfully completed before the scheduled time frame
was in good knowledge of the Govt. of Odisha. We worked for 24 x 7 Days to
complete the work looking towards the urgency of that period, and the Prestige
of our State Odisha as lacs of pilgrims had to come Puri for Nabakalebara.
b)
Successfully completed Two Projects under Pattamundai Canal Division & One under
Macchagaon Canal Division funded by ADB through Water Resources Department,
Govt. of Odisha before the scheduled completion period. For these works we were
awarded Bonus from the DoWR, Govt. of Odisha
FEW OF THE COMPLETED PROJECTS
Sl. No |
Work Name |
Organisation |
Agreement value in Rs. (Lakhs) |
Status |
1 |
Construction of Storm Water Drainage System from Hospital Square to Musa River (Part - A) |
TheSenior Manager (Civil), OCC Ltd. Puri Group of Projects, Puri |
₹ 745.38 |
Completed Satisfactorily |
2 |
Construction of balance work of Storm Water Drainage System in Puri Town (Zone – v )
(Part - a) Drain from Baliapanda out post out falling to Mangala Nadi |
The Senior Manager (Civil), OCC Ltd.Puri Group of Projects, Puri |
₹ 649.63 |
Completed Satisfactorily |
3 |
Construction of Storm Water Drainage System Of Puri Town of Primary & Secondary Drain
Zone - V (Withdrawal portion for NABAKALEBARA Urgency Part - II (Sub Part - B) |
The Senior Manager (Civil), OCC Ltd. Puri Group of Projects, Puri |
₹ 92.88 |
Completed Satisfactorily |
4 |
Construction of Storm Water Drainage System Of Puri Town of Primary & Secondary Drain
Zone - V (Withdrawal portion for NABAKALEBARA Urgency Part - II(Sub Part - A) |
Senior Manager (Civil), OCC Ltd. Puri Group of Projects, Puri |
₹ 346.46 |
Completed Satisfactorily |
5 |
Construction of Storm Water Drainage System Of Puri Town of Primary & Secondary Drain
Zone - V (Withdrawal portion for NABAKALEBARA Urgency Part - I |
Senior Manager (Civil), OCC Ltd. Puri Group of Projects, Puri |
₹ 389.80 |
Completed Satisfactorily |
6 |
Raising & strengthening of Uttikan Embankment from RD 0.0km to RD 2.0km (Alava to Nimpur)
under NABARD Assistance RIDF - XIX |
The Executive Engineer, Kendrapara Irrigation Division, Kendrapara, Odisha |
₹ 1,217.64 |
Completed Satisfactorily |
7 |
Rehabilitation, Extension & Modernisation of Distributories Gobari extension canal from
RD 00km. To 4.51km. Of Pattamundai canal including structures, selective lining
& repair to canal embankment roads under Pkg No CW-NCB-PAT- 18 |
The Executive Engineer. Pattamundai Canal Division. Kendrapara |
₹ 419.21 |
Completed Satisfactorily |
8 |
Rehabilitation, Extension & Modernisation of DistributoriesGobari extension canal from RD
4.51km. To 8.50km. Of Pattamundai canal including structures, selective lining
&repair to canal embankment roads under Pkg No CW-NCB-PAT- 19 |
The Executive Engineer. Pattamundai Canal Division. Kendrapara |
₹ 385.49 |
Completed Satisfactorily |
9 |
PMGSY - A.D.B/R.C.I. P) In the district of Kendrapara No OR - 16 - ADB - 06/ TI (Ashram
balikuda to Gopinathapur |
The Executive Engineer. Rural Works Division, Cuttack |
₹ 227.10 |
Completed Satisfactorily |
10 |
PMGSY (ADB Rural connectivity investment programme) in the district of Cuttack Pkg. No.
OR - 07 - ADB - 26/T - II |
The Executive Engineer. Rural Works Division, Cuttack |
₹ 293.84 |
Completed Satisfactorily |
11 |
Improvement to Road and CD works including maintenance of Rural roads under PMGSY for
2008-09 in the District of Cuttack Package No: - OR-07-137/VII |
The Executive Engineer. Rural Works Division, Cuttack |
₹ 321.90 |
Completed Satisfactorily |
12 |
Construction of Road & CD Works including Maintenance of Rural Roads under PMGSY in the
District of Cuttack for 2012-13 Package No. OR-07-182/XII and Routine
Maintenance |
The Executive Engineer. Rural Works Division, Cuttack |
₹ 226.02 |
Completed Satisfactorily |
Sl. No |
Work Name |
Organisation |
Agreement value in Rs. (Lakhs) |
Status |
13 |
Improvement To Katikata Tilanga Road |
The Executive Engineer. Rural Works Division, Cuttack |
₹ 215.64 |
Completed Satisfactorily |
14 |
Renovation of Hingma Distributory from RD 00KM to RD 9.858KM, Ex- Hariharjore Main Canal
of HIP (Working RD 4.020 KM to RD 9.858 KM) |
The Senior Manager (Civil), OCC Ltd Sonepur Group of Projects, Sonepur |
₹ 537.14 |
Completed Satisfactorily |
15 |
Rehabilitation, Extension and
Modernisation of DY - 2 Bhagalpur Distributory And DY - 19 of Machhagaon Main
Canal Including All Structure Under Pkg. No. - CW-NCB-MAC-04 |
The Executive Engineer, Machhagaon Canal Division, Jagatsinghpur |
₹ 473.56 |
Completed Satisfactorily |
16 |
Rehabilitation, Extension and
Modernisation of DY - 8, DY - 10 And DY - 10 H of Machhagaon Main Canal
Including All Structure Under Pkg. No. - CW-NCB-MAC-06 |
The Executive Engineer, Machhagaon Canal Division, Jagatsinghpur |
₹ 543.15 |
Completed Satisfactorily |
17 |
Improvement to Drainage System of Naibaranallah and its branches under DOAB - XVI in
Buguda&Aska Block (D.I.P) |
The Executive Engineer, Drainage Division, Berhampur |
₹ 376.90 |
Completed Satisfactorily |
18 |
Construction of MDR Bridge over Taladanda Canal from Settlement Office side to S.C.B. |
The Senior Manager (Civil),OCC Ltd Cuttack Group of Projects, Cuttack |
₹ 599.85 |
Completed Satisfactorily |
19 |
Renovation of Ratnagiri Drainage Channel with its system of Jajpur in Brahmani -
Baitarani DOAB No - II |
The Executive Engineer, Drainage Division, Jajpur |
₹ 254.05 |
Completed Satisfactorily |
20 |
Renovation of Garabandhanallah with its link drains of Jajpur District in Brahmani -
Baitarani DOAB No - XIV under DIP |
The Executive Engineer, Drainage Division, Jajpur |
₹ 210.53 |
Completed Satisfactorily |
21 |
Renovation of Katha nallah with is link Drain of Jajpur District in Brahamani - Baitarani
DOAB No - XIV under DIP |
Executive Engineer, Drainage Division, Jajpur |
₹ 273.21 |
Completed Satisfactorily |
22 |
Renovation of deep channel erosion near the road on the left of the spillway river sluice
block. Construction of a toe wall with a single monolithic R.C.C Structure
consisting of a cut-off , apron & toe wall to avoid scour & further destruction
of the road under Dam Rehabilitation
and Improvement Project(DRIP) |
Executive Engineer, Earth Dam Division, Chitrakonda |
₹ 1,038.69 |
Completed Satisfactorily |
23 |
D/S Protection works on the Left & Right of Spill Channel of U.K Dam with Construction of
Guard Wall & Stone Packing Works under DRIP |
Executive Engineer, U.K Head Works Division, Kolabnagar |
₹ 384.93 |
Completed Satisfactorily |
24 |
Improvement to Road communication network, Improvement to drainage system and
construction of compound wall/fencing along the boundary of U.K. Dam, Kolabnagar
under DRIP |
Executive Engineer, U.K Head Works Division, Kolabnagar |
₹ 287.77 |
Completed Satisfactorily |
Sl. No |
Work Name |
Organisation |
Agreement value in Rs. (Lakhs) |
Status |
13 |
Improvement To Katikata Tilanga Road |
The Executive Engineer. Rural Works Division, Cuttack |
₹ 215.64 |
Completed Satisfactorily |
14 |
Renovation of Hingma Distributory from RD 00KM to RD 9.858KM, Ex- Hariharjore Main Canal
of HIP (Working RD 4.020 KM to RD 9.858 KM) |
The Senior Manager (Civil), OCC Ltd Sonepur Group of Projects, Sonepur |
₹ 537.14 |
Completed Satisfactorily |
15 |
Rehabilitation, Extension and
Modernisation of DY - 2 Bhagalpur Distributory And DY - 19 of Machhagaon Main
Canal Including All Structure Under Pkg. No. - CW-NCB-MAC-04 |
The Executive Engineer, Machhagaon Canal Division, Jagatsinghpur |
₹ 473.56 |
Completed Satisfactorily |
16 |
Rehabilitation, Extension and
Modernisation of DY - 8, DY - 10 And DY - 10 H of Machhagaon Main Canal
Including All Structure Under Pkg. No. - CW-NCB-MAC-06 |
The Executive Engineer, Machhagaon Canal Division, Jagatsinghpur |
₹ 543.15 |
Completed Satisfactorily |
17 |
Improvement to Drainage System of Naibaranallah and its branches under DOAB - XVI in
Buguda&Aska Block (D.I.P) |
The Executive Engineer, Drainage Division, Berhampur |
₹ 376.90 |
Completed Satisfactorily |
18 |
Construction of MDR Bridge over Taladanda Canal from Settlement Office side to S.C.B. |
The Senior Manager (Civil),OCC Ltd Cuttack Group of Projects, Cuttack |
₹ 599.85 |
Completed Satisfactorily |
19 |
Renovation of Ratnagiri Drainage Channel with its system of Jajpur in Brahmani -
Baitarani DOAB No - II |
The Executive Engineer, Drainage Division, Jajpur |
₹ 254.05 |
Completed Satisfactorily |
20 |
Renovation of Garabandhanallah with its link drains of Jajpur District in Brahmani -
Baitarani DOAB No - XIV under DIP |
The Executive Engineer, Drainage Division, Jajpur |
₹ 210.53 |
Completed Satisfactorily |
21 |
Renovation of Katha nallah with is link Drain of Jajpur District in Brahamani - Baitarani
DOAB No - XIV under DIP |
Executive Engineer, Drainage Division, Jajpur |
₹ 273.21 |
Completed Satisfactorily |
22 |
Renovation of deep channel erosion near the road on the left of the spillway river sluice
block. Construction of a toe wall with a single monolithic R.C.C Structure
consisting of a cut-off , apron & toe wall to avoid scour & further destruction
of the road under Dam Rehabilitation
and Improvement Project(DRIP) |
Executive Engineer, Earth Dam Division, Chitrakonda |
₹ 1,038.69 |
Completed Satisfactorily |
23 |
D/S Protection works on the Left & Right of Spill Channel of U.K Dam with Construction of
Guard Wall & Stone Packing Works under DRIP |
Executive Engineer, U.K Head Works Division, Kolabnagar |
₹ 384.93 |
Completed Satisfactorily |
24 |
Improvement to Road communication network, Improvement to drainage system and
construction of compound wall/fencing along the boundary of U.K. Dam, Kolabnagar
under DRIP |
Executive Engineer, U.K Head Works Division, Kolabnagar |
₹ 287.77 |
Completed Satisfactorily |
Sl. No |
Work Name |
Organisation |
Agreement value in Rs. (Lakhs) |
Status |
25 |
Construction of RCC retaining wall and bed lining from RD 3300mtr to RD 3470 mtr,RD
3490mtr To 3685mtr,RD 3695m3968mtr to RD 3835mtr,RD 3850mtr to RD 3968mtr, RD
4118mtr to RD 5818mtr of DhobijoreNallah in Sambalpur town under Drainage
Improvement Plan (Reach – I) |
The Senior Manager (Civil), Sambalpur Group Of Projects, Sambalpur |
₹ 3,343.84 |
Completed Satisfactorily |
26 |
Improvement of water supply to Cuttack, Distribution of Ward no 56, 57, 58, 59including
Slum (AMRUT/OD/CUTTACK/WS/39) |
The Executive Engineer, P.H. Division-1, Cuttack |
₹ 1,880.75 |
Completed Satisfactorily |
27 |
Improvement of Water Supply to Cuttack-New Z11 And Head Works P-1
(AMRUT/OD/CUTTACK/WS/34) |
The Executive Engineer, P.H. Division-1, Cuttack |
₹ 2,609.19 |
Completed Satisfactorily |
28 |
Extension of Distribution network to uncovered areas and allied works in Zone – 4 of SMC,
Including slums (AMRUT/OD/SBP/WS/44) |
The Executive Engineer, P.H. Division, Sambalpur |
₹ 2,123.09 |
Completed Satisfactorily |
29 |
Improvement of Water supply to uncovered poor Urban Areas (27 nos.) in ward no. – 14, 15,
16, 17, 18, 23, 24, 25, 26 & 34 under Z4 of Sambalpur Municipal Corporation
under (AMRUT/OD/SBP/WS/27) |
The Executive Engineer, P.H. Division, Sambalpur |
₹ 1,090.65 |
Completed Satisfactorily |
30 |
Rehabilitation of existing 9.00MLD WTP, Impovement of distribution system and
construction of service reservoirs and alied works in Hirakud Town (Zone – 3 of
SMC), including slums (AMRUT/OD/SBP/WS/40) |
The Executive Engineer, P.H. Division, Sambalpur |
₹ 635.72 |
Completed Satisfactorily |
31 |
IMPROVEMENT OF W/S TO UNCOVERED POOR URBAN AREAS (27 NOS.) (AMRUT/OD/BALASORE/WS/16) |
The Executive Engineer, P.H. Division, Balasore |
₹ 545.28 |
Completed Satisfactorily |
32 |
Improvement of W/S to uncovered areas of Bhubaneswar under P.H Division - II(package - I)
(AMRUT/OD/BBSR/WS/84) |
The Executive Engineer, P.H. Division-2, BBSR |
₹ 1,150.09 |
Completed Satisfactorily |
33 |
Improvement of W/S to Slums in Puri Town Odisha (AMRUT/OD/PURI/WS/11) |
The Executive Engineer, P.H. Division, Puri |
₹ 523.60 |
Completed Satisfactorily |
34 |
Improvement of water Supply to Uncovered Areas (Including Slums) of BMC
(AMRUT/OD/BHUBANESWAR/WS/76-77-78) |
The Executive Engineer, P.H. Division-1, BBSR |
₹ 767.30 |
Completed Satisfactorily |
35 |
Rennovation of Ratnagiri Drainage Channel with its System under Brahamani-Birupa DOAB No
- II |
The Executive Engineer, Jajpur Drainage Division. Jajpur, Odisha. |
₹ 254.05 |
Completed Satisfactorily |
36 |
Construction of Seed Storage Godown with RCC Column & steel Truss with Profile Sheet
Roofing at Sambalpur Town, Dist-Sambalpur |
The Senior Manager (Civil) OCC Ltd. Sambalpur Group of Projects |
₹ 61.09 |
Completed Satisfactorily |
Sl. No |
Work Name |
Organisation |
Agreement value in Rs. (Lakhs) |
Status |
37 |
Construction of Seed Storage Godown & Processing Plant building for Odisha State Seeds
Corporation Ltd, Satasankha, Puri |
The Senior Manager (Civil), OCC Ltd., Puri Group of Projects, Puri |
₹ 99.46 |
Completed Satisfactorily |
38 |
Construction Of H.L Bridge over River Saptadhara on Atalguda Sarangapalli Road |
The Executive Engineer, Rural Works Division, Malkangiri |
633.37 |
Completed Satisfactorily |
39 |
Construction of Chitrotpala Right Branch Canal (RD 20.875 km to 23.490 km) and
Construction of associated structures (MCII - 03) |
The Executive Engineer, M.C.I.I Division, Manijanga |
₹ 1,230.33 |
Completed Satisfactorily |
40 |
Construction of Chitrotpala Right Branch Canal (RD 18.015 km to 20.875 km) and
Construction of associated structures (MCII - 02) |
The Executive Engineer, M.C.I.I Division, Manijanga |
₹ 1,254.47 |
Completed Satisfactorily |
41 |
Construction of Minor and Sub minor canal of CRBC (00 km to 7.00km) with construction of
associated structures under PKG No. CW-NCB-MCI-7 (A) |
The Executive Engineer, M.C.I.I Division, Manijanga |
₹ 377.77 |
Completed Satisfactorily |
42 |
Construction of Minor and Sub minor canals of CRBC (7.00 km to 15.200 km) with
Construction of Associated Structures under Package No. CW-NCB-MCI - 7(B) |
The Executive Engineer, M.C.I.I Division, Manijanga |
₹ 366.96 |
Completed Satisfactorily |
43 |
Construction of Minor and Sub minor Canal of CRBC (RD 17.435 kmto 21.440 km) with
associated structures under Package No. 8(B) |
The Executive Engineer, M.C.I.I Division, Manijanga |
₹ 562.73 |
Completed Satisfactorily |
44 |
Construction of Odisha state seed corporation Go-down with steel struss and profile sheet
roofing at Nayagada, Dist-Nayadaga |
The Senior Manager (Civil) OCC Ltd.Nayagarh
Group of Projects, Nayagarh |
₹ 67.37 |
Completed Satisfactorily |
45 |
Construction of cross Drainage Structure at RD15.680 km of DBC of RBC of RIP. |
Executive Engineer Right Canal. Division No-VI, Jagatpur |
₹ 436.20 |
Completed Satisfactorily |
46 |
Construction of High-Level Bridge across river Telengiri at RD 6180m of Periphery Road of
Telengiri Irrigation Project |
The Senior Manager (Civil) OCC Ltd., Telengiri Spillway Project, Koraput. |
₹ 856.44 |
Completed Satisfactorily |
47 |
Protection to Talsari Udaypur Service Road |
The Executive Engineer,Balasore Irrigation Division, Balasore |
₹ 838.54 |
Completed Satisfactorily |